A university block refitted in one vacation
Lecture, library and faculty refit inside 42 days
Client
Private university
Location
Pune, India
Year
2024
Category
Project Procurement
An entire academic block — lecture theatres, library and faculty offices — had to be refitted between the end of one term and the start of the next.
Scope
- 01Contract-grade seating for four lecture theatres
- 02Library shelving, study carrels and reading lighting
- 03Faculty office furniture and storage
- 04Complete works inside the 42-day vacation window
The numbers behind it.
Customisation
Lecture seating was produced in the university's identity colours with moulded writing tablets specified for left- and right-handed positions.
Result
The block reopened on the first day of term. A second block was awarded on the same terms.
42
Days, start to finish
1,080
Lecture seats
3
Buildings covered